Jayaprakash Nagar metro station

Coordinates: 12°54′26″N 77°34′23″E / 12.907299°N 77.573133°E / 12.907299; 77.573133
From Wikipedia, the free encyclopedia

Jayaprakash Nagar
Namma Metro station
General information
Other namesJaya Prakash Nagara, JP Nagar, JP Nagara, Sarakki
LocationKanakapura Rd, Gangadhar Nagar, JP Nagar, Bengaluru, Karnataka 560078
Coordinates12°54′26″N 77°34′23″E / 12.907299°N 77.573133°E / 12.907299; 77.573133
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line Orange Line
Platforms  Side platform

Platform-1 → Nagasandra
Platform-2 → Silk Institute

  (TBC)
Tracks2 (current)
Construction
Structure typeElevated, Double track
Platform levels2 (current)
AccessibleYes Disabled access
Other information
StatusStaffed
Station codeJPN
History
Opened  18 June 2017; 7 years ago (2017-06-18)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Banashankari
towards Nagasandra
Green Line Yelachenahalli
Kadirenahalli Cross
towards Kempapura
Orange Line
(Planned)
JP Nagar 5th Phase
Location
Map

Jaya Prakash Nagar is an elevated metro station on the north–south corridor of the Green Line of Namma Metro serving the J. P. Nagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]

This metro station is proposed to be an interchange for the upcoming, proposed Orange Line.

Station layout[edit]

Green Line Station Layout[edit]

Jayaprakash Nagar track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
next station is Yelachenahalli
Platform 1
Northbound
Towards ← Nagasandra
next station is Banashankari
Side platform | Doors will open on the left Disabled access
L2

Orange Line Station Layout (TBC)[edit]

Jayaprakash Nagar track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → JP Nagar 4th Phase
next station is JP Nagar 5th Phase
Platform #
Northbound
Towards ← Kempapura
next station is Kadirenahalli Cross
Side platform | Doors will open on the left Disabled access
L2

Facilities[edit]

Connections[edit]

Entry/exits[edit]

Entry/exits are situated on the Kanakapura road, one on the outer ring road side and the other on the JP nagar sixth phase side.

See also[edit]

References[edit]

  1. ^ "Nagasandra-Puttenahalli Metro line to open by May-end, says KJ George". The Times of India. 3 May 2017. Retrieved 2 July 2017.

External links[edit]